Works on Kaliuta crossing (2) along the Great East road
The Road Development Agency, RDA, has recorded about 55 percent physical progress on the construction of drainage structures at Kaliuta Crossing Two along the Great East Road in Nyimba District. The crossing is located between the Kacholola and Mvuwa areas. The project, which commenced on July 5th, 2026, is expected to be completed by September 5th, 2026. The works involve replacing the existing metal pipe culvert with reinforced concrete box culverts to improve drainage and protect the road infrastructure. As […]